Insulation Procedure

Insulation Procedure

Fixing of trapazodial profile sheet & tiles profile sheet with the help of fasteners.
Before start of sheeting work, ensure purlin, girts and structure are in true plane, correctly placed and properly fixed.
For installation of metal roofing and claddings, the pre-requisite for optimum performance is to ensure that.
Well washed, thogoughly draining, well ventilated conditions are provided.
Dis similar metal contact, run-off from more nobel metal, cement and concrete materials are avoided.
At the time of lying, sequence should be taken care of prevailing wind direction.
Most care full to position the first sheet to ensure it lies square and straight to the end.
At the time of installatoion lay each complete row of sheets starting from valley gutter towards ridges before starting next row.
All electrical equipments/tools must be properly earthed.
Always take extra care while handling extra long sheets over height windy condition.

If You Need Any Solution.....We Are Available For You

Home
Products
Whats App
Contact Us