Pre Engineered Building
Pre Engineered Building
We specialize in the domain of providing Pre Engineered Buildings to the clients. This is suitable for various applications such as commercial, industrial, warehousing etc. Offered range is designed on the basis of ISO specifications and global standards. Experts are providing complete service of fabrication & engineering, ensuring better quality control at each stage of the process. We are providing this at market leading rates.
Application :
Agricultural Storage Building
Industrial Building
Warehouses
School Buildings, Health Centers
Garages, Bus Shelters ,Car Parks
Commercial Building
Multi-Storied Shopping Malls
Sports Complexes and Stadium
Metro Rail Shelters
Specifications:-
Feature:
Pre-Engineered Buildings (PEBs)
Conventional Buildings
Design:
Quick and efficient; since PEBs are mainly formed of standard sections and connections, design time is significantly reduced. Basic designs are used over and over.
Slow: Each conventional steel structure is designed from scratch by the Consultant, with fewer design aids available to the Engineer.
Delivery:
Average 6 to 8 weeks.
Average 20 to 26 weeks.
Foundations:
Simple design, easy to construct and light weight.
Extensive, heavy foundations required.
Erection Cost & Time:
Both costs & time of erection are minimized.
Typically, they are 20% more expensive than PEB. In most of the cases, the erection costs and time are not estimated accurately.
The erection process is easy, fast, step by step and with hardly any requirement for equipments.
Erection is slow and extensive field labour is required. Heavy equipment is often needed.
Architecture:
Outstanding architectural design can be achieved at low cost using standard architectural features and interface details.
Special architectural design and features must be developed for each project, which often require research and thus resulting in much highter costs.
Future Expansion:
PEB Building are designed with future expansion in mind. It is simple, easy and cost effective. One supplier can co-ordinate changes.
Future expansion would be more difficult and, more likely, costlier.
Responsibility:
Single responsibility for design, supply and even erection of PEBs.
Multiple responsibilities can result in questions of who is responsible when components do not fit properly.
Features:
Pre-Engineered & Custom Built Construction
Customized Designs
Ease of Installation
Send Enquiry